The importance of drilling an energy well

The efficiency of a geothermal heating system largely depends on the correct dimensioning of the energy well and high-quality drilling. Renewe offers a reliable drilling service that ensures the optimal operation of the geothermal heat pump for decades to come. The implementation of a high-quality end result is guaranteed by Finland's best drilling professionals, accurate dimensioning and design service, and comprehensive delivery - we take care of permit issues, implementation, and finishing.

The function of the energy well:

• Collects thermal energy stored in the ground for use in a ground source heat pump
• Reduces the property's energy costs in an environmentally friendly way

Pricing for different geothermal heat pump capacities

Drilling and installation costs depend on the property's annual energy consumption, the efficiency of the ground source heat pump, and the geological conditions of the plot and site.

How do I choose the right power class?

Check your property's annual heating energy consumption from your electricity or oil bills:

• A typical electrically heated house consumes 15,000 – 25,000 kWh per year, take into account and subtract the share of household electricity from the total, on average 5,000 kWh per year
• In an oil-heated house, 1,000 liters of oil corresponds to approximately 10,000 kWh of energy.

Below is an example pricing for an average property for different efficiency classes:

Energiakaivon poraus hinta arvio

The final price will be specified during the review phase, which takes into account permit issues, soil conditions, and the specified drilling depth. Connect through us geothermal heat pump, energy well– and installation – this way you can easily get the entire delivery from one supplier!

What happens after ordering?

1️. Permit issues and preliminary investigation

• We check the permits required by the municipality and apply for a drilling permit if necessary. The order includes a booking fee of €99.00, which will be refunded in the final drilling price. If the permit is denied, the booking fee will not be refunded.
• We assess the suitability of the plot and site as a whole for drilling an energy well.
• Note: It is the customer's responsibility to report pipes, cables and other underground obstacles within the plot that are not marked on official utility maps.

2️. Sizing and design

• Determination of drilling location and depth based on the site's heat requirement.
• Assessment of conditions (soil, groundwater and possible constraints).

3️. Final price confirmation

• Possible additional costs (e.g. special drilling or additional materials) are estimated before work begins.

4️. Drilling, commissioning and invoicing

• Processing permit matters in municipalities takes an average of 2 months.
• Drilling, excavating and installing an energy well using cutting-edge technology.
• Finishing and commissioning for the installation of a ground source heat pump.
• The energy well is invoiced when drilling is completed and handover is made.

Drilling and installation time is agreed separately, usually implementation takes 1–3 business days.
Household deduction (-35%) for oil heating (-60%) for drilling and installation!

The service includes:

• All permits and drilling with high-quality equipment
• Required materials, well sealing and penetrations
• Implementation according to industry best practices

Additional services (can be arranged separately):

• Special earthworks, horizontal wells and special drilling
• Demanding diamond penetrations, corrugations and piping
• Dismantling and recycling of the old system

Why choose Renewe?

Experts in the field – long experience and Tukes-approved professionals

• Comprehensive service – permitting, drilling and geothermal heat pump installation
• Reliable and safe implementation – professional sizing and finishing
• Customer service to support you – we will advise and help you throughout the process

We are also happy to help you personally, further information and sales: 010 660 3030 / myynti@renewe.fi.

Standard drilling of an energy well | reservation

★★★★☆
|
16 reviews
RENEWE
Product no.: 60015

Professional energy well drilling as part of your geothermal system.

Energy well drilling – reservation fee €99.00, refunded in the drilling price, if the permit is denied, the reservation fee is not refundable.

• Includes permits, drilling, materials and standard installation
• Compatible with Renewe ground source heat pumps and installation
• Pricing according to the kW power and heat demand of the geothermal heat pump
• First stage, review and clarification of permit issues by us

99,00 

In store

Tarkista asennuspalvelun saatavuus alueellasi

Syötä postinumerosi ja tarkista, onko asennus saatavilla alueellasi.

Warranty
2
years

See our general terms and conditions. We generally offer installation and contracting services within an hour's drive of our Helsinki office. We offer services to corporate customers throughout Finland on a case-by-case basis.

Do you want to make an investment without large lump sums? We offer flexible financing in cooperation with a reliable partner.
  • Financing starts at €50/month
  • Quick and easy application
  • No hidden costs or commitment</li
  • You will receive a decision immediately upon purchase.
  • You can pay for your products at your own pace and enjoy the benefits immediately.

    Financing starting from €50 / month

    Make your energy investment without high initial costs – let the savings cover your purchase. Flexible financing gives you the space to act when the solution is relevant.

    Do you need help?
    We help from planning to implementation

    Whether it's a product, an order or an installation, you can always turn to us. Together we will find a solution that suits your needs. Contact our experts – we will help you make a safe and sustainable choice.

    Are you interested in renewable energy? Stay tuned, subscribe to the newsletter