{"id":4812,"date":"2026-01-13T11:46:00","date_gmt":"2026-01-13T11:46:00","guid":{"rendered":"https:\/\/renewe.fi\/?post_type=asiakastarina&#038;p=4812"},"modified":"2026-04-02T13:06:43","modified_gmt":"2026-04-02T13:06:43","slug":"alykasta-energiaa-logistiikkaan-aurinkovoimala-ja-akusto-leikkasivat-terminaalin-huipputehot","status":"publish","type":"asiakastarina","link":"https:\/\/renewe.fi\/en\/asiakastarina\/alykasta-energiaa-logistiikkaan-aurinkovoimala-ja-akusto-leikkasivat-terminaalin-huipputehot\/","title":{"rendered":"Smart energy for logistics: Solar power plant and battery system cut terminal peak power"},"content":{"rendered":"<h3 class=\"wp-block-heading\">In the logistics terminal, load fluctuations and peaks in transfer fees were driving up costs. Forklifts and yard equipment needed fast, scalable charging.<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Logirin Oy&#039;s terminal handles large volumes of goods every day and the terminal has several electric forklifts, lifts and other heavy equipment in constant use.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The company&#039;s production director Sepp\u00e4l\u00e4 describes the situation before Renewe&#039;s solution: &quot;Our energy costs had risen worryingly, and especially transmission peaks increased the bills significantly. When several trucks arrived at the same time and the trucks were charging, the electricity consumption peaks were huge.&quot;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Additionally, the terminal needed a faster and more efficient charging solution for its fleet. Queues at old charging stations were causing delays and reducing productivity.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Comprehensive planning and customized solution<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Logirin contacted Renewe in search of a solution for its energy management. Renewe&#039;s experts conducted a thorough assessment of the terminal&#039;s energy consumption, load profiles, and future needs.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\u201cThe Renewe team was very professional. They took the time to understand our business needs and challenges. We were not offered a ready-made package, but a truly customized solution,\u201d Sepp\u00e4nen says.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Renewe designed and delivered a comprehensive energy package:<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Solar power system:<\/strong> A 220 kWp solar panel system was installed on the terminal&#039;s extensive roof. <a href=\"https:\/\/renewe.fi\/en\/tuotteet\/aurinkopaneelit\/\" data-type=\"link\" data-id=\"https:\/\/renewe.fi\/tuotteet\/aurinkopaneelit\/\">Solar panels<\/a> was oriented in an east-west direction, which ensures more consistent energy production throughout the day compared to the traditional south orientation.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Energy storage:<\/strong> 0.6 MWh \/ 0.3 MW battery system smooths out consumption peaks, <a href=\"https:\/\/renewe.fi\/en\/tuotteet\/akustot\/\" data-type=\"link\" data-id=\"https:\/\/renewe.fi\/tuotteet\/akustot\/\">batteries<\/a> act as backup power for critical loads and enable electricity to be purchased at the most affordable times.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Charging infrastructure:<\/strong> Both AC and DC power were installed in the terminal.<a href=\"https:\/\/renewe.fi\/en\/tuotteet\/latausasemat\/\" data-type=\"link\" data-id=\"https:\/\/renewe.fi\/tuotteet\/latausasemat\/\">charging stations<\/a> (80-150 kW) for electric vehicles. The system intelligently prioritizes charging and dynamically manages loads.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Energy Management System (EMS):<\/strong> Intelligent control systems automatically optimize the use of solar energy, battery and charging according to the spot electricity price and terminal needs.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Smooth implementation and deployment<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">The project was implemented in phases to avoid disrupting the terminal&#039;s normal operations, and the installation took approximately three weeks.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\u201cRenewe\u2019s project manager kept us informed throughout the project. Communication was excellent, and the schedule was met. Our staff received comprehensive training on how to use the new charging stations,\u201d Sepp\u00e4nen says.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The system was implemented gradually, and Renewe&#039;s experts ensured that everything was working optimally before the project was completed.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Significant savings and improved operational reliability<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">The effects of the new energy solution were immediately visible.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">&quot;Our peak power decreased by an estimated 25-35 percent, which is directly reflected in transmission fees. This is a huge saving on an annual basis,&quot; Sepp\u00e4nen rejoices.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The solar panel system provides a significant portion of the terminal&#039;s energy needs during the daytime, when operations are at their busiest. The battery system stores excess energy for later use or sells it back to the grid during the most profitable times.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\u201cThe energy management system is a real game changer. It automatically buys electricity during the cheapest hours and uses the battery during the more expensive ones. We don&#039;t have to do anything ourselves \u2013 the system takes care of everything,\u201d Virtanen explains.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Improved charging infrastructure has brought more flexibility. With DC fast charging, forklifts and lifts can be charged significantly faster, reducing waiting times and improving availability.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\u201cThere are no more queues at charging stations, and the fleet is more ready for use. This has significantly improved our productivity.\u201d<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The environmental impact is also significant. The terminal&#039;s CO\u2082 emissions have been reduced thanks to its own solar energy production and smart energy management.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Investing in the future<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">The owners are very satisfied with the solution and see it as a strategic investment.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\u201cOur energy costs have decreased by about 35 percent, and the payback period is estimated to be 5-7 years. After this, we will save significantly every year,\u201d Sepp\u00e4nen calculates.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\u201cThe system is also scalable. As we expand our operations, we can easily add capacity to both solar panels, energy storage and charging.\u201d<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Sepp\u00e4l\u00e4 warmly recommends Renewe to other logistics operators.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\u201cRenewe understands the needs of the industry. They don&#039;t just sell equipment, they act as a partner who helps find the best solution for your business needs. I highly recommend them!\u201d<\/p>\n\n\n\n<div style=\"height:7px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<p class=\"wp-block-paragraph\"><em>Are you interested? Contact us and let&#039;s discuss how we can help you find the best energy solutions. Book a free survey: 010 660 3030, info@renewe.fi or&nbsp;<a href=\"https:\/\/renewe.fi\/en\/ota-yhteytta\/\">fill out the form online<\/a><\/em>.<\/p>","protected":false},"excerpt":{"rendered":"<p>Logistiikkaterminaalissa kuormitusvaihtelut ja siirtomaksujen huiput paisuttivat kustannuksia. Trukkikalusto ja pihalaitteet tarvitsivat nopeaa, skaalautuvaa latausta. Logirin Oy:n terminaali k\u00e4sittelee p\u00e4ivitt\u00e4in suuria tavaram\u00e4\u00e4ri\u00e4 ja terminaalissa on jatkuvassa k\u00e4yt\u00f6ss\u00e4 useita s\u00e4hk\u00f6trukkeja, nostimia ja muuta raskaata kalustoa. Yrityksen tuotantojohtaja Sepp\u00e4l\u00e4 kuvaa tilannetta ennen Renewen ratkaisua: &#8221;Energiakustannuksemme olivat nousseet huolestuttavasti, ja etenkin siirtohuiput nostivat laskuja merkitt\u00e4v\u00e4sti. Kun useampi kuorma-auto saapui [&hellip;]<\/p>\n","protected":false},"featured_media":4813,"template":"","format":"standard","meta":{"_acf_changed":false,"_breakdance_hide_in_design_set":false,"_breakdance_tags":"","footnotes":""},"class_list":["post-4812","asiakastarina","type-asiakastarina","status-publish","format-standard","has-post-thumbnail","hentry"],"acf":[],"_links":{"self":[{"href":"https:\/\/renewe.fi\/en\/wp-json\/wp\/v2\/asiakastarina\/4812","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/renewe.fi\/en\/wp-json\/wp\/v2\/asiakastarina"}],"about":[{"href":"https:\/\/renewe.fi\/en\/wp-json\/wp\/v2\/types\/asiakastarina"}],"version-history":[{"count":3,"href":"https:\/\/renewe.fi\/en\/wp-json\/wp\/v2\/asiakastarina\/4812\/revisions"}],"predecessor-version":[{"id":4824,"href":"https:\/\/renewe.fi\/en\/wp-json\/wp\/v2\/asiakastarina\/4812\/revisions\/4824"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/renewe.fi\/en\/wp-json\/wp\/v2\/media\/4813"}],"wp:attachment":[{"href":"https:\/\/renewe.fi\/en\/wp-json\/wp\/v2\/media?parent=4812"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}